 |
~~~——
|
|
|
|
~~~——
|
|
|
|
~~~——
|
|
|
|
~~~——
|
|
|
|
~~~——
|
|
|
|
~~~——
|
|
|
|
~~~——
|
|
|
|
~~~——
|
|
|
|
|
 |
|
 |
国内统一刊号:CN44-0126 代号:45-47 中山日报社出版 Email:zsrb@zsrb.cn |
|
|
|
|
Main line of Shenzhen-Zhongshan Link connected
|
|
|
|
|
|
On November 28, the main line of Shenzhen-Zhongshan Link, or Shenzhen-Zhongshan Bridge, was connected. The construction of the Link is expected to be completed by 2024. By then, the traveling time from Zhongshan to Shenzhen will be cut to within 30 minutes. Text translation Li Jing
|
|
来源:中山日报
|
|
|
|